The option is b False. A work breakdown structure (WBS) is a hierarchical decomposition of a project into smaller, more manageable tasks. It is a commonly used tool in project management that helps to organize and structure complex projects.
While there are certain guidelines and best practices for creating a work breakdown structure for construction projects, there is not necessarily one correct way to do it for each type of project.
The structure of the WBS will vary based on the specific project scope, requirements, and resources available. It is important for project managers to tailor the WBS to the unique needs of each project.
Learn more about Structure: https://brainly.com/question/12053427
#SPJ11
a steel compression member has a fixed supportat one end and a frictionless ball joint at the other end asshown. the total applied design load consists of a dead loadof 7 kips and an unspecified live load. this compressionmember is controlled by which type of buckling?
A steel compression member with a fixed support at one end and a frictionless ball joint at the other end, as described, is subject to a specific type of buckling known as Euler's critical buckling.
This buckling phenomenon occurs when the applied load reaches a critical value, causing the member to suddenly buckle and deform. In this case, the total applied design load consists of a 7 kip dead load and an unspecified live load. Since the fixed support provides full restraint, while the frictionless ball joint allows rotational movement, the member experiences one end fixed, and one end pinned boundary conditions. This configuration results in a lower buckling load capacity compared to a member with fixed supports at both ends, making it crucial to consider Euler's critical buckling when designing this compression member.
To know more about frictionless visit:
brainly.com/question/26515803
#SPJ11
FOR BRAINLIST HELP PLEASE IS A DCP
A- Causes of the 13t Amendment
B- Reasons for Women's Suffrage
C- Reasons for the Freedmen's Bureau
D- Causes of the Plantation System
Answer:
C
Explanation: Freedmens Bureau provided resources for southerners and newly freed slaves
During a shrinkage limit test, a 19.3 cm3 saturated clay sample with a mass of 37 g was placed in a porcelain dish and dried in the oven. The oven-dried sample had a mass of 28 g with a final volume of 16 cm3 . Determine the shrinkage limit and the shrinkage ratio.
Answer:
shrinkae limit = 20.35%
shrinkage ratio = 1.45
Explanation:
1. to get the shrinkage limit we would first calculate the moisture content w.
w = (37-28)/28
= 9/28
= 0.3214
then the formula for shrinkage limit is
\([w-\frac{(V-Vd}{wd} ]*100\)
w = 0.3214
V = 19.3
Vd = 16
Wd = 28
when we put these values into the formula:
\([0.3214-\frac{(19.3-16)}{28} ]*100\\\)
= 20.35%
2. the shrinkage limit = Wd/V
= 28/19.3
= 1.45
* Question 1: Design alarm system as shown below. The alarm turns on when one of the following
conditions happened:
A. Motion IR sensor & window sensor
activated.
B. Motion IR sensor & door sensor
activated.
C. Otherwise the buzzer off.
(A)
Warning
Motion
Sensors
Buzzer
Suppose that: Warning buzzer on pin 8
Motion sensor on pin 5
Window sensor on pin 6
Door sensor on pin 7
The buzzer works on beating mode.
(C)
Door
sensor
TE
(B)
Window
Sensors
Answer:
A
Explanation:
Consider a mild steel specimen with yield strength of 43.5 ksi and Young's modulus of 29,000 ksi. It is stretched up to a point where the strain in the specimen is 0.2% (or 0.002). If the specimen is unloaded (i.e. load reduces to zero), the residual strain (or permanent set) is: 0.05% 0.1% 0% 0.2%
Answer:
0.05%
Explanation:
From the question, we have;
The yield strength of the mild steel, \(\sigma _c\) = 43.5 ksi
Young's modulus of elasticity, ∈ = 29,000 ksi
The total strain, \(\epsilon _c\) = 0.2% = 0.002
The inelatic strain \(\epsilon_c^{in}\) is given as follows;
\(\epsilon_c^{in}\) = \(\epsilon _c\) - \(\sigma _c\)/∈
Therefore, we have;
\(\epsilon_c^{in}\) = 0.002 - 43.5/(29,000) = 0.0005
Therefore, the inelastic strain, \(\epsilon_c^{in}\) = 0.0005 = 0.05%
Taking the inelastic strain as the residual strain, we have;
The residual strain = 0.05%
Exercise 7.1.7: Car Inventory Spoints Let's Go A car company wants to keep a list of all the cars that they have in stock. The company has created a Car class that stores important information about each of their cars. Initialize an ArrayList called inventory that stores each Car that the company has in stock. Status: Not Submitted 7.1.7: Car Inventory Save Submit + Continue iii FILES о со Ол еш мн import java.util.ArrayList; 2 public class CarTracker 3- { public static void main(String[] args) 5 { 6 //Initialize your ArrayList here: 7 } CarTracker.java Car.java Status: Not Submitted 7.17: Car Inventory Save Submit + Continue !!! 2-{ FILES 1 public class Car 3 String name; String model; 5 int cost; public Car (String name, String model, int cost) { this.name 10 this.model = model; this.cost = cost; 12 } CarTracker.java Car.java 6 7 8- 9 = name; 11 13
Answer: To initialize an ArrayList called inventory that stores Car objects in Java, you can use the following code:
import java.util.ArrayList;
public class CarTracker
{
public static void main(String[] args)
{
// Initialize your ArrayList here:
ArrayList<Car> inventory = new ArrayList<>();
}
}
The ArrayList is initialized using the ArrayList<Car> syntax, where Car is the type of objects that will be stored in the ArrayList. The ArrayList is then instantiated using the new ArrayList<>() syntax. You can then add Car objects to the ArrayList using the add method. For example, the following code adds a Car object with the name "Ford", model "Fiesta", and cost $15,000 to the inventory ArrayList:
// Add a Car object to the inventory ArrayList
Car car1 = new Car("Ford", "Fiesta", 15000);
inventory.add(car1);
You can add as many Car objects to the inventory ArrayList as you need. To retrieve a Car object from the ArrayList, you can use the get method and specify the index of the Car object you want to retrieve. For example, the following code retrieves the first Car object in the inventory ArrayList:
// Get the first Car object in the inventory ArrayList
Car car = inventory.get(0);
You can then access the fields of the Car object using the dot notation, as shown in the following code:
// Print the name, model, and cost of the Car object
System.out.println("Name: " + car.name);
System.out.println("Model: " + car.model);
System.out.println("Cost: $" + car.cost);
This code would output the name, model, and cost of the Car object.
a) Water strider bug is supported on surface of the pond by surface tension acting along interface between water and bug's legs. Determine the minimum length of this interface needed to support the bug let the weight of the bug is 10−4 N
b) Repeat part (a) if surface tension were to support aperson weighing 750N.
12. What procedure should you follow when taking measurements?
A. Verify the tester is accurate,
B. Calibrate the tester.
C. Remove power from the circuit and test for zero volts for safety.
D. Start with the highest scale and work down.
Air at 40C flows over a 2 m long flat plate with a free stream velocity of 7 m/s. Assume the width of the plate (into the paper) is 0.5 m. If the plate is at a constant temperature of 100C, find:
Complete Question
Air at 40C flows over a 2 m long flat plate with a free stream velocity of 7m/s. Assume the width of the plate (into the paper) is 0.5 m. If the plate is at a co temperature of 100C,find:
The total heat transfer rate from the plate to the air
Answer:
\(q=1.7845\)
Explanation:
From the question we are told that:
Air Temperature \(T_1=40c\)
Length \(l=2m\)
Velocity \(v=7m/s\)
Width \(w=0.5\)
Constant temperature \(T_t= 100C\)
Generally the equation for Total heat Transfer is mathematically given by
\(q=hA(T_s-T_\infty)\)
Where
h=Convective heat transfer coefficient
\(h=29.9075w/m^2k\)
Therefore
\(q=h(L*B)(T_s-T_\infty)\)
\(q=29.9075*(2*0.5)(100+273-(40+273))\)
\(q=1794.45w\)
\(q=1.7845\)
Determine the location of the maximum bending moment. In the formula, w is the rate of load increase in lb ft and l is the length (in ft) of the beam. calculus
https://vm.tiktok.com/ZSeMW4ttQ/ https://vm.tiktok.com/ZSeMW4ttQ/ https://vm.tiktok.com/ZSeMW4ttQ/ https://vm.tiktok.com/ZSeMW4ttQ/
10.16 In a particular common-source amplifier for which the midband voltage gain between gate and drain (i.e., -EmR'L) is -29 V/V, the NMOS transistor has Сgs = 1.0 pF and Cgd = 0.1 pF. What input capacitance would you expect? For what range of signal-source resistances can you expect the 3-dB frequency to exceed 2 MHz?
The input capacitance of the common-source amplifier is 0.2 pF, calculated using the given values. The range of signal-source resistance for which the 3 dB frequency exceeds 2 MHz is from 0 Ω to 398 Ω.
Given that midband voltage gain between gate and drain of a common-source amplifier is -29 V/V. Capacitance of CGS and CGD is 1.0 pF and 0.1 pF respectively.
We are to find the input capacitance and the range of signal-source resistance for which the 3 dB frequency exceeds 2 MHz.Input capacitance:
In general, the input capacitance of a common-source amplifier can be approximated as follows:
\($$C_{in} = C_{gs}+ C_{gd}(1+ A_{v})$$\)
Here, Aᵛ is the voltage gain. It is given that Aᵛ = -29 V/V. Hence, substituting the given values in the above equation:
\($$C_{in} = C_{gs}+ C_{gd}(1+ A_{v})$$$$C_{in} = 1.0 pF + 0.1 pF (1-29)$$$$C_{in} = 1.0 + 0.1(-28)$$ $$C_{in} = 0.2\text{ pF}$$\)
Therefore, the input capacitance of the common-source amplifier is 0.2 pF.
Range of signal-source resistance: The 3 dB frequency is given by the equation,\($$f_{3dB} = \frac{1}{2\pi (R_s+ R_{g})C_{in}}$$\), where
Rs is the source resistance, Rg is the gate resistance, and Cin is the input capacitance.From the above equation, it can be observed that the 3 dB frequency of the amplifier increases with decreasing source resistance.
Therefore, for the 3 dB frequency to exceed 2 MHz, the signal-source resistance should be less than or equal to \($\frac{1}{2\pi (2 MHz)C_{in}}= 398 \ \Omega $$\).
Hence, the range of signal-source resistance for which the 3 dB frequency exceeds 2 MHz is from 0 Ω to 398 Ω.
Learn more about input capacitance: brainly.com/question/16998502
#SPJ11
What is a Home Run terminology that is used in Electrical Wiring?
Answer:
Any circuit that goes directly from the fixture to the breaker panel. For dedicated outlets, isolated fixtures and high-load items, you would want them to be on their own breakers. Those would get a home run, a line that goes all the way back without stopping.
what is the most utilized renewable resource of the united states? * 1 point wind biomass hydroelectric solar
Wind is the most utilized renewable resource of the United States. According to the U.S. Energy Information Administration, wind energy accounted for 7.3% of total U.S. electricity generation in 2019.
This is more than any other renewable energy source, including biomass, hydroelectric, and solar. Wind energy is generated by the movement of air, which is harnessed by wind turbines. Wind turbines convert the kinetic energy of the wind into electrical energy, which can then be used to power homes and businesses. Wind energy is a clean, renewable, and cost-effective source of energy that can help reduce the United States' dependence on fossil fuels. Wind energy is generated by the movement of air, which is harnessed by wind turbines. Biomass energy is generated by burning organic materials, such as wood, agricultural waste, and animal waste. Hydroelectric energy is generated by the movement of water, which is harnessed by dams and other structures. Solar energy is generated by the sun, which is harnessed by solar panels.
Learn more about wind energy here
https://brainly.com/question/29293441
#SPJ4
When a heater is turned on, the fuse wire repeatedly gets burnt even after changing the same fuse wire with the same length and width, the wire keeps getting burnt. Which of the following is advisable?
First, because a current greater than its capacity is being flowed through, the fuse burns out repeatedly. Now,. I and R have an inverse relationship (current). The fuse wire's length and current rating are independent. Fuse wire is capable of carrying electricity over any distance, but thickness—which regulates melting—is crucial.
Why does fuse wire burn?All of the circuit's current flows through a metal ribbon that is inside the fuse. If too much current flows through the ribbon—which is sized to fit the gauge of the circuit wire—it melts through or "blows," and the circuit is destroyed.(ii) The fuse wire's length and current rating are independent. Fuse wire is capable of carrying electricity over any distance, but thickness—which regulates melting—is crucial.If the current is too high, the element heats up to a greater temperature, melts immediately, or melts a soldered junction inside the fuse, opening the circuit and cutting off the current. Therefore, it is irrelevant how long the fuse wire is.To learn more about Fuse wire refer to:
https://brainly.com/question/15409880
#SPJ1
The rectifier is used to
Answer:
A rectifier is an electrical device used to convert alternating current to direct current.
Explanation:
Hope this helps! Shalom
Write out the combined statements of the first and second laws for the energy functions, U = U(S, P), H = H(S, P), F = F(T, V), and G = G(T, P).
The first law of thermodynamics states that the total energy of a closed system is constant; energy can neither be created nor destroyed, only transformed from one form to another.
How can this be shown mathematically?This law can be expressed mathematically as:
dU = dQ - dW
Where dU is the change in internal energy, dQ is the heat added to the system, and dW is the work done by the system.
The second law of thermodynamics states that the entropy of a closed system always increases over time, approaching a maximum value at equilibrium. This law can be expressed mathematically as:
dS > 0
Where dS is the change in entropy.
Using these laws, we can write out the combined statements for the energy functions as follows:
For U = U(S, P):
dU = TdS - PdV
For H = H(S, P):
dH = TdS + VdP
For F = F(T, V):
dF = -SdT - PdV
For G = G(T, P):
dG = -SdT + VdP
Where T is the temperature, V is the volume, and S is the entropy.
Read more about energy functions here:
https://brainly.com/question/11622973
#SPJ1
are there any companies that you can get a job at as an air craft engeer after university
Explanation:
most big airports. my father has the same degree and works for southwest airlines
A branch circuit is supplying a single hermetic refrigerant motor-compressor for an air conditioning unit. The hermetic refrigerant motor-compressor rated-load current is 18 amperes. If a 30-ampere fuse will not start the motor-compressor, the maximum rating of the branch-circuit short-circuit and ground-fault protective device may be increased to ___.
The maximum rating of the branch-circuit short-circuit and ground-fault protective device for the hermetic refrigerant motor-compressor can be increased to 45 amperes to ensure it can handle the motor's inrush current during startup without tripping.
When determining the maximum rating of the branch-circuit short-circuit and ground-fault protective device for a hermetic refrigerant motor-compressor, it is essential to consider both the rated-load current and the starting current of the motor-compressor.
In this case, the hermetic refrigerant motor-compressor has a rated-load current of 18 amperes.
However, it is mentioned that a 30-ampere fuse will not start the motor-compressor.
This indicates that the motor-compressor has a higher starting current than its rated-load current.
Motor-compressors often experience inrush current during startup due to the high torque required to overcome the initial resistance and inertia.
This starting current is typically higher than the rated-load current and decreases once the motor-compressor reaches its operating speed.
To accommodate the starting current and ensure proper operation, it is common to use a protective device with a rating higher than the motor-compressor's rated-load current.
The National Electrical Code (NEC) provides guidelines for sizing protective devices based on the motor's starting characteristics.
According to NEC Table 430.52, the multiplier for determining the maximum rating of the protective device for a motor with a high inrush current is 250% of the motor's full-load current.
Applying this multiplier to the rated-load current of 18 amperes:
Maximum rating = 18 A * 250% = 45 A
For more questions on short-circuit
https://brainly.com/question/32141202
#SPJ11
What signal propagation phenomena causes the diffusion, or the reflection in multiple different directions, of a signal?
In the radio communication system, multipath is the propagation phenomenon that causes diffusion or reflection in multiple different directions of a signal.
Multipath is a propagation mechanism that impacts the propagation of signals in radio communication. Multipath results in the transmission of data to the receiving antenna by two or more paths. Diffusion and reflection are the causes that create multiple paths for the signal to be delivered.
Diffraction occurs when a signal bends around sharp corners; while reflection occurs when a signal impinges on a smooth object. When a signal is received through more than one path because of the diffraction or reflection, it creates phase shifting and interference of the signal.
You can learn more about signal propagation at
https://brainly.com/question/14452898
#SPJ4
This is the reflex response that occurs when electrical current passes through the human body.
SVect the best option.
Answer:
Electric shock
Explanation:
hope this helps
p.s. the next question is Flexible
Water at 15degree Celsius passes through 2cm internal diameter copper tubes at a rate of
0.55kg/s. Determine the pumping power per meter of pipe length required to maintain this flow
at the specified rate.
Answer :
Im not really sure tbh
Explanation: Water at 15°C is heated by passing it through 2-cm internal-diameter thin-walled copper tubes. Heat is supplied to the water by steam that condenses outside the copper tubes at 120°C. If water is to be heated to 65°C at a rate of 0.2 kg/s, determine (a) the length of the copper tube that needs to be used and (b) the pumping power requirement to overcome pressure losses. Assuming the entire copper tube to be at steam temperature of 120°C
A seven inch diameter centrifuge carries a 50 mL of blood (blood density at 0.994g/mL). If the centripetal acceleration is 64 feet per second, rotational speed is 345 rpm. Determine the centrifugal force in pound force.
Centrifugal force is the force exerted on an object moving in a circular path and directed outward from the center. In order to determine the centrifugal force in pound-force of a centrifuge carrying 50mL of blood, we will need to use the formula for centripetal force:
Centrifugal force = (mass x acceleration)/radius
Here's how to solve the problem:
First, we need to determine the mass of the blood being carried by the centrifuge. We know the volume of blood (50 mL) and the density of blood (0.994 g/mL), so we can use the formula:
mass = volume x density
mass = 50 mL x 0.994 g/mL
mass = 49.7 g
Next, we need to convert the given units to SI units (meters and seconds):
Centripetal acceleration = 64 ft/s^2
1 ft = 0.3048 m
Centripetal acceleration = 64 ft/s^2 x 0.3048 m/ft = 19.5072 m/s^2
Rotational speed = 345 rpm
1 rpm = 1/60 s
Rotational speed = 345 rpm x 1/60 s = 5.75 s^-1
Now we can use the formula to calculate centrifugal force:
Centrifugal force = (mass x acceleration)/radius
The radius of the centrifuge is half the diameter (3.5 inches or 0.0889 meters):
Centrifugal force = (49.7 g x 19.5072 m/s^2)/0.0889 m
Centrifugal force = 10,879.52 N
Finally, we need to convert Newtons to pound-force:
1 N = 0.22481 lb-f
Centrifugal force = 10,879.52 N x 0.22481 lb-f/N
Centrifugal force = 2,442.69 lb-f
Therefore, the centrifugal force in pound-force is 2,442.69 lb-f.
To know more about determine visit :
https://brainly.com/question/29898039
#SPJ11
Describe some three materials with nanocrystalline structures and identify each example of those material
Ultrafine crystalline grains in the nanometer range that are separated by grain boundaries or interfaces define nanocrystalline materials.
A nanocrystalline structure: what is it?A polycrystalline substance with a few nanometer-sized crystallites is referred to as a nanocrystalline (NC) substance. These materials bridge the gap between traditional coarse-grained materials and amorphous materials devoid of long-range organisation. Materials that contain clusters, crystallites, or molecules with diameters between 1 and 100 nm are said to be nanostructured materials.
What is an example of a nanostructure?The gecko's foot, iridescent butterfly wings, and hydrophobic leaves are just a few examples of nanostructures found in nature. Scientists and engineers are employing biomimicry to develop new goods with these nano-inspired qualities.
To know more about nanocrystalline materials visit:-
brainly.com/question/12978045
#SPJ1
how many square feet does a gallon of primer cover
The square feet coverage of a gallon of primer may vary depending on the quality of the primer and the porosity of the surface being primed. On average, a gallon of primer can cover approximately 200-300 square feet. However, it is always best to consult the manufacturer's instructions for the specific primer being used as it will provide a more accurate estimate of coverage.
Generally, when buying paint or primer, it is important to know the coverage area to ensure that you purchase enough to cover the entire surface adequately. Factors such as the number of coats, the thickness of the coat, and the method of application will all play a role in determining the coverage area. For example, using a roller instead of a brush may result in a more even application and, therefore, use less primer. Furthermore, it is important to keep in mind that using too little primer may result in uneven coverage and may not provide adequate protection against moisture and other environmental factors.
To know more about instructions, visit:
https://brainly.com/question/13278277
#SPJ11
What computer program can you use to publish and share a research project with others?
Excel Charts
Email application
Pie chart program
Word Online
Answer:
Word Online is the program
How does concurrent engineering speed up product development?
A. The product and process are designed using computer-aided design.
B. The product and process are designed in series.
C. The product and process are designed in separate spaces.
D. The product and process are designed simultaneously.
Answer:
The product and process are designed simultaneously
Explanation:
PENN
Artificial intelligence involves the development of machines and computer systems that can simulate human intelligence processes.
1) True
2) False
a plug-in transformer, supplies 9.00 v to a video game system. what is its input current when its output is 1.30 a?
The calculated answer is NpVs = NsVp=- 0.086A
utilizing the transformer formula, which, as shown, connects the coil's number of turns N, emf V, and produced current I;
where Ns/Np = Vs/Vp = Ip/Is;
The secondary and primary coils' respective turn counts are Ns and Np, respectively.
The relative emf in the secondary and primary coils is Vs and Vp.
The current in the secondary and primary coils, respectively, is and is
assuming Vp = 120V (input voltage), Np = 384 turns, and Vs = 9V (output voltage) Ns =?
Using the equation Ns/Np = Vs/Vp
Ns/384 = 9/120
multiplying by two
120Ns = 384×9
120Ns = 3456
Ns = 3456/120
Ns = 28.8
Ns = roughly 29 turns
9/120 = Ip/1.14
multiplied by two;
120Ip = 9×1.14
120Ip = 10.26
Ip = 10.26/120
Ip = 0.086A
Learn more about output here-
https://brainly.com/question/24179864
#SPJ4
Is a 10 foot ladder long enough to safely reach a landing that is 9 feet above the adjacent floor
Answer:
Definitely not
Explanation:
You should have 1-2 feet of extra ladder on a flat surface so 1 foot on an adjacent floor is a no no
(20 points) A 1 mm diameter tube is connected to the bottom of a container filled with water to a height of 2 cm from the bottom. Air flows from the tube into the liquid and creates spherical bubbles with diameter about the diameter of the tube (1 mm). Everything is at 298 K. The tube is short but is connected to a much longer 2 m long hose that is 6 mm in diameter. The hose is connected to the gas supply. If there is no gas flow the water will leak into the tube and into the supply hose. When gas flows the water is blocked from entering the tube and bubbling starts. State all assumptions in answering the following questions. (a) What should be the minimum air flow rate and the gas supply pressure to keep the water from leaking back into the tube? (b) Is the flow in the hose laminar or turbulent? Is the flow in the tube laminar or turbulent?
Solution :
Given :
h = 2 cm
Diameter of the tube , d = 1 mm
Diameter of the hose, D = 6 mm
Between 1 and 2, by applying Bernoulli's principle, we get
As point 1 is just below the free surface of liquid, so
\($P_1=P_{atm} \text{ and} \ V_1=0$\)
\($\frac{P_{atm}}{\rho g}+\frac{v_1^2}{2g} +h = \frac{P_2}{\rho g}$\)
\($\frac{101.325}{1000 \times 9.81}+0.02 =\frac{P_2}{\rho g}$\)
\($P_2 = 111.35 \ kPa$\)
Therefore, 111.325 kPa is the gas supply pressure required to keep the water from leaking back into the tube.
Velocity at point 2,
\($V_2=\sqrt{\left(\frac{111.135}{\rho g}+0.02}\right)\times 2g$\)
= 1.617 m/s
Flow of water, \($Q_2 = A_{tube} \times V_2$\)
\($=\frac{\pi}{4} \times (10^{-3})^2 \times 1.617 $\)
\($1.2695 \times 10^{-6} \ m^3/s$\)
Minimum air flow rate,
\($Q_2 = Q_3 = A_{hose} \times V_3$\)
\($V_3 = \frac{Q_2}{\frac{\pi}{4}D^2}$\)
\($V_3 = \frac{1.2695 \times10^{-6}}{\pi\times 0.25 \times 36 \times 10^{-6}}$\)
= 0.0449 m/s
b). Reynolds number in hose,
\($Re = \frac{\rho V_3 D}{\mu} = \frac{V_3 D}{\nu}$\)
υ for water at 25 degree Celsius is \($8.9 \times 10^{-7} \ m^2/s$\)
υ for air at 25 degree Celsius is \($1.562 \times 10^{-5} \ m^2/s$\)
\($Re_{hose}=\frac{0.0449 \times 6 \times 10^{-3}}{1.562 \times 10^{-5}}$\)
= 17.25
Therefore the flow is laminar.
Reynolds number in the pipe
\($Re = \frac{V_2 d}{\nu} = \frac{1.617 \times 10^{-3}}{8.9 \times 10^{-7}}$\)
= 1816.85, which is less than 2000.
So the flow is laminar inside the tube.