All of these, Here both task A & B are on critical path. So all of these options are correct i.e, A and B has the same Early Finish and Late Start.
What is Critical Path?
The critical path is the longest sequence of tasks that must be completed in order to complete a project. The tasks on the critical path are referred to as critical activities because if they are delayed, the entire project will be delayed.
Finding the critical path is critical for project managers because it allows them to do the following:
Estimate the total project duration precisely.Determine task dependencies, resource limitations, and project risks.Create realistic project schedules by prioritizing tasks.Project managers use the critical path method (CPM) algorithm to define the shortest amount of time required to complete each task with the least amount of slack.
To learn more about Critical Path, visit: https://brainly.com/question/14036336
#SPJ4
secure boot can be enabled when system in user mode
No, secure boot can only be enabled when the system is in UEFI mode. Therefore, The given statement is false.
What is secure boot?Secure Boot is a feature that is included in most modern computers and operating systems. It helps ensure that only trusted software is loaded during the boot process. It works by verifying the digital signature of the boot loader before running it. It also verifies the digital signature of any other software that is loaded before it can be executed.
Secure Boot also prevents malicious code from being loaded during the boot process. This helps protect the system from malicious attacks, viruses and other forms of malicious software. Secure Boot also helps protect the system from malicious tampering and unauthorized access. Secure Boot also helps protect the system from malicious software and viruses that can be spread by external storage devices such as USB flash drives.
To learn more about secure boot
brainly.com/question/13168395
#SPJ4
c programming question
Given n, take the sum of the digits of n. If that value has more than one digit, continue reducing in this way until a single-digit number is produced. The input will be a non-negative integer.
Answer:
int digitSum(int n) {
int sum = 0;
while (n) {
sum += n % 10;
n /= 10;
}
return sum < 10 ? sum : digitSum(sum);
}
int main()
{
int n = 12345;
printf("Digit sum of %d is %d\n", n, digitSum(n));
}
Explanation:
The recursion takes care of the repeated summing in case the sum has more than 1 digit.
When using an observational method of data collection, what type of information is potentially gathered
Observational method of data collection involves systematically observing and recording behavior or events without actively intervening or manipulating the environment. This method can potentially gather a wide range of information, including:
Descriptions of behavior: Observers can record detailed descriptions of the behavior they observe, including what is said, actions taken, and any other relevant details.
Frequency and duration of behavior: Observers can count how often a behavior occurs and how long it lasts, which can help to quantify patterns of behavior.
Nonverbal communication: Observers can record nonverbal communication such as facial expressions, body language, and tone of voice.
Contextual factors: Observers can take note of contextual factors that may influence behavior, such as the physical environment or social setting.
Relationships between variables: Observers can look for relationships between different variables, such as how often a behavior occurs in response to a particular stimulus or in the presence of certain environmental factors.
Overall, observational methods can provide rich, detailed data about behavior and events, making them a valuable tool for research in many fields.
Learn more about data here:
https://brainly.com/question/10980404
#SPJ11
Discuss the core technologies and provide examples of where they exist in society. Discuss how the core technologies are part of a larger system
Answer:
Part A
The core technologies are the technologies which make other technologies work or perform their desired tasks
Examples of core technologies and where they exist are;
Thermal technology, which is the technology involving the work production, storage, and transfer using heat energy, exists in our refrigerators, heat engine, and boilers
Electronic technology is the technology that involves the control of the flow of electrons in a circuit through rectification and amplification provided by active devices. Electronic technology can be located in a radio receiver, printed circuit boards (PCB), and mobile phone
Fluid technology is the use of fluid to transmit a force, provide mechanical advantage, and generate power. Fluid technologies can be found in brakes, automatic transmission systems, landing gears, servomechanisms, and pneumatic tools such as syringes
Part B
The core technologies are the subsystems within the larger systems that make the larger systems to work
The thermal technology in a refrigerator makes use of the transfer of heat from a cold region, inside the fridge, to region of higher temperature, by the use of heat exchange and the properties of the coolant when subjected to different amount of compression and expansion
The electronic technologies make it possible to make portable electronic devises such as the mobile phones by the use miniaturized circuit boards that perform several functions and are integrated into a small piece of semiconductor material
Fluid technologies in landing gears provide reliable activation of the undercarriage at all times in almost all conditions such that the landing gears can be activated mechanically without the need for other source of energy
Explanation:
Core technologies includes biotechnology, electrical, electronics, fluid, material, mechanical, and others.
What are core technologies?Core Technologies are known to be the framework of technology systems. The major Core Technologies includes:
Mechanical StructuralMaterials, etc.They are also called "building blocks" of all technology system as without time, technology would not be existing today.
Learn more about Core technologies from
https://brainly.com/question/14595106
How can the effectiveness of e-mail advertising campaigns be measured directly?.
Email advertising campaigns can be measured in various ways. One can know the success of the email campaign by calculating the email open rate, click-through rate, conversion rate, and the overall return on investment.
Open rates: Email open rates refer to the number of recipients who open an email. A high open rate signifies that the email's subject line is captivating and relevant to the recipient. An average open rate varies from one industry to another.
Return on investment: ROI is the ultimate metric for determining the success of an email campaign. The ROI is determined by the cost of sending the email and the revenue generated from the campaign. The email marketing campaign's ROI can be calculated by taking the total revenue generated and dividing it by the total cost of the campaign.
To know more about success visit:
https://brainly.com/question/32281314
#SPJ11
HELP PLS!!! In a presentation, what is layout?
(2)
Q.4 Combined the following sentences using a relative pronoun
(i) This is the girl. Her pocket was picked.
Explanation:
This is the girl whose pocket was picked.
A ____ can capture a user's credentials and credit card numbers and send them to someone else.
A keystroke logger can capture a user's credentials and credit card numbers and send them to someone else.
What is a keystroke logger?A keystroke logger is also referred to as a keyboard capture or keystroke and it can be defined as an activity-monitoring software program that is typically designed and developed to monitor, capture, snoop, record and share an end user's personal data with a cyber-attacker or hacker.
What is credential harvesting?Credential harvesting is also referred to as account harvesting and it can be defined as a type of attack that involves the use of the following techniques to illegally obtain large numbers of user credentials (username or password):
MITM attacksKeystroke loggerDNS poisoningPhishingIn this context, we can infer and logically deduce that a keystroke logger can capture an end user's credentials and credit card numbers and send them to someone else.
Read more on keylogger here: brainly.com/question/17231901
#SPJ4
Implement a four-bit synchronous sequencer using flip-flops (type J-K).
This counter must follow the sequence: 2, 3, 6, 7, 9, 1, 14 and repeats.
The output should be displayed on four leds or on a display.
The input should be controlled by a clock based on a 555 timer with a frequency of approximately 1 second.
Justify your designs, implement the corresponding tables with the current and next states show the implemented circuit connection diagram or simulation
To implement a four-bit synchronous sequencer using J-K flip-flops, we can follow these steps Determine the number of states: In this case, we have eight states: 2, 3, 6, 7, 9, 1, 14, and repeat. Assign binary values to each state: We need four bits to represent eight states. Let's assign the binary values as follows:
Create a state transition table: This table shows the current state, inputs, and the next state. It helps us understand the sequence and connections between the states. Here's an example of the state transition table:
| Current State | Input | Next State |
|---------------|-------|------------|
| 0010 | CLK | 0011 |
| 0011 | CLK | 0110 |
| 0110 | CLK | 0111 |
| 0111 | CLK | 1001 |
| 1001 | CLK | 0001 |
| 0001 | CLK | 1110 |
| 1110 | CLK | 1110 |
| 1110 | CLK | 0010 |
Determine the excitation table: The excitation table helps us determine the inputs required for the J-K flip-flops to transition from one state to another. In this case, since we are using J-K flip-flops, the excitation table will have J and K inputs. Here's an example of the excitation table:
| Current State | Next State | J | K |
|---------------|------------|----|----|
| 0010 | 0011 | 0 | 1 |
| 0011 | 0110 | 0 | 1 |
| 0110 | 0111 | 0 | 1 |
| 0111 | 1001 | 0 | 1 |
| 1001 | 0001 | 0 | 1 |
| 0001 | 1110 | 0 | 1 |
| 1110 | 1110 | X | X |
| 1110 | 0010 | 1 | 0 |
Design the circuit: Based on the excitation table, we can connect the J-K flip-flops to create the circuit. Each flip-flop will have J and K inputs, and the outputs will be connected to the inputs of the next flip-flop. Connect the clock input to the flip-flops to synchronize the transitions. Connect the outputs of the flip-flops to the four LEDs or display to show the current state.
To know more about synchronous visit :
https://brainly.com/question/27189278
#SPJ11
does some one have a presentation for pc viruses
Answer:
yes. don't get one. they huant ur pc and make ads pop up consistantly.
To obtain your first driver's license, you must successfully complete several activities. First, you must produce the appropriate identification. Then, you must pass a written exam. Finally, you must pass the road exam. At each of these steps, 10 percent, 15 percent and 40 percent of driver's license hopefuls fail to fulfil the step's requirements. You are only allowed to take the written exam if your identification is approved, and you are only allowed to take toe road test if you have passed the written exam. Each step takes 5, 3 and 20 minutes respectively (staff members administering written exams need only to set up the applicant at a computer). Currently the DMV staffs 4 people to process the license applications, 2 to administer the written exams and 5 to judge the road exam. DMV staff are rostered to work 8 hours per day. (i) Draw a flow diagram for this process (ii) Where is the bottleneck, according to the current staffing plan? (iii) What is the maximum capacity of the process (expressed in applicants presenting for assessment and newly-licensed drivers each day)? Show your workings. (iv) How many staff should the DMV roster at each step if it has a target to produce 100 newly-licensed drivers per day while maintaining an average staff utilisation factor of 85%? Show your workings.
The flow diagram for the given process is shown below. The bottleneck is the part of the process that limits the maximum capacity for driver license.
In the given process, the bottleneck is the road exam, where 40% of the driver's license applicants fail to fulfill the step's requirements.(iii) Maximum Capacity of the Process: The maximum capacity of the process can be calculated by finding the minimum of the capacities of each step. Capacity of the identification process = (1 - 0.10) × 480/5
= 86.4 applicants/dayCapacity of the written exam process
= (1 - 0.15) × 480/3
= 102.4
applicants/dayCapacity of the road exam process = (1 - 0.40) × 480/20
= 28.8 applicants/day
Therefore, the maximum capacity of the process is 28.8 applicants/day.Staff Required for 100 Newly-Licensed Drivers per Day: Let the staff required at the identification, written exam, and road exam steps be x, y, and z respectively. From the above calculations, we have the following capacities:86.4x + 102.4y + 28.8z = 100/0.85
To know more about driver visit:
https://brainly.com/question/30485503
#SPJ11
Text is -------.Choose the answer .
A)any kind of picture ,like a photograph ,clip art ,map,vector ,or illustration
B)any sequence of words or characters that a reader can understand
C)a recording of moving images
D)an edit made to an element or features of an element
Answer:
B
Explanation:
Because the text is -------. it is a sequence of characters that a reader can understand.
the manager of a digital forensics lab is responsible for which of the following? ensuring that staff members have enough training to do the job making necessary changes in lab procedures and software knowing the lab objectives all of the above
That staff members have received sufficient training to complete their duties, including understanding the lab's goals and making necessary software and procedure changes.
A manager of a digital forensics lab is responsible for which of the following?The primary responsibilities of the role holders will be to manage staffing and resources, monitor performance, increase efficiency, motivate staff, and oversee professional development. In order to incorporate laboratory policy documents and procedures into the quality management system, they will write them.
What is needed in a lab for digital forensics?A cyber-forensic lab needs the best software and hardware to function properly; In addition, we require devices that are forensically equipped for specialized digital forensics, data transmission facilities and accessories, and related services.
To know more about software visit :-
https://brainly.com/question/985406
#SPJ4
A _______ attack uses software to try thousands of common words sequentially in an attempt to gain unauthorized access to a user's account. Trojan horse dictionary web bug denial-of-service
Answer:
Rogue
Explanation:
A rogue attack uses software to try thousands of common words in an attempt to gain unauthorized access to a user's account.
Rogue access equipment would be any WLAN radio channel that isn't even authorized to communicate or join the corporate connection.Whenever they have been misconfigured as well as set up without authentication, it creates a new security vulnerability potentially gaining simple access to a private network.
Thus the response above is correct.
Learn more about software attacks here:
https://brainly.com/question/25407509
Which of the following problems associated with storing data in a list is avoided by storing data in a relational database?
A) Maintaining the data may require changing the same data value in many locations.
B) Inconsistency when a data item is used multiple times
C) Inability to store partial data
D) Duplication of data items
E) All of the above
E) All of the above
Storing data in a relational database avoids all the mentioned problems associated with storing data in a list. Thus, Option E, All of the above, is correct.
What is a relational database?A relational database is a data storage structure that uses multiple tables to store data. Each table contains rows and columns, with each row representing a unique record and each column representing a unique field.
Relational databases are the most prevalent type of database used in industry because they are effective at storing and managing structured data, which is data that can be easily organized into tables with distinct columns and rows.
They are made up of multiple tables that are related to one another in some way. Relational databases use a structured query language (SQL) to communicate with the database. SQL is a standard language that is used to access, manipulate, and query relational databases.
Option E is correct.
Learn more about relational database https://brainly.com/question/13262352
#SPJ11
While running your app in debug mode with breakpoints enabled, which command in the Debug menu and toolbar will you use to Execute one statement at a time?a.) Stop Debuggingb.) Step Outc.) Step Intod.) Continue
Answer:
c. step into
Explanation:
To execute one statement at a time while running an app in debug mode with breakpoints enabled, you would use the "Step Into" command. This command allows you to move through the code one line at a time, executing each statement and stepping into any method calls that are encountered. It is useful for closely examining the execution flow and variables at each step.
Part 1, Remove All From String CodeHS what is the answer???
The Remove All From String function is a function that takes two strings as its arguments, and remove all occurrence of the second string from the first
The program in PythonThe function written in Python, where comments are used to explain each action is as follows:
#This defines the function
def RemoveAllFomString(str1, str2):
#This returns the new string after the second string have been removed
return str1.replace(str2, "")
Read more about python programs at:
https://brainly.com/question/26497128
#SPJ2
Answer:
def remove_all_from_string(word, letter):
while letter in word:
x=word.find(letter)
if x == -1:
continue
else:
word = word[:x] + word[x+1:]
return word
print(remove_all_from_string("hello", "l"))
Explanation:
this worked for me
Which three individuals were involved in creating programming languages?
A. Kathleen Booth
B. Charles Babbage
C. John G. Kemeny
D. Grace Hopper
The three individuals that were involved in creating programming languages are:
A. Kathleen Booth
C. John G. Kemeny
D. Grace Hopper
What is a software?A software can be defined as a set of executable instructions that is typically used to instruct a computer system on how to perform a specific task and proffer solutions to a particular problem.
What is programming?Programming can be defined as a process through which software developer and computer programmers write a set of instructions (codes) that instructs a software on how to perform a specific task on a computer system.
Based on historical information and records, we can infer and logically deduce that the three individuals that were involved in creating programming languages are:
Kathleen Booth John G. KemenyGrace HopperRead more on programming languages here: brainly.com/question/26497128
#SPJ1
What is/are the correct increasing order of downlink of satellite bands? Select one or more: □ a. L < Ku
The correct increasing order of downlink satellite bands is - L < S < C < Ku < Ka (Option B).
How is this so?It is to be noted that the order of downlink satellite bands is based on their frequencies,with lower frequencies being assigned to longer wavelengths.
In this case, L-band has lower frequency thanS -band, C-band has lower frequency than both L-band and S-band, and so on, resulting in the order L < S < C < Ku < Ka.
The downlink satellite bands,in increasing order of frequency are:
L-bandS-bandC-bandKu-band and Ka-band.Learn more about Satellite bands:
https://brainly.com/question/31384183
#SPJ1
Write a program that reads the content of a text file called text.txt. the program should create a dictionary in which the keys are individual words found in the file and the values are the amount of times the word appears in the file. For example, if the word 'the' appears in the file 128 times, the dictionary would contain an element with the key as 'the' and the value as 128. Write in Python
Answer:
python
Copy code
# Open the text file for reading
with open('text.txt', 'r') as file:
# Initialize an empty dictionary to store word counts
word_counts = {}
# Loop through each line in the file
for line in file:
# Split the line into individual words
words = line.split()
# Loop through each word in the line
for word in words:
# Remove any punctuation from the word
word = word.strip('.,;:?!')
# Convert the word to lowercase
word = word.lower()
# If the word is already in the dictionary, increment its count
if word in word_counts:
word_counts[word] += 1
# If the word is not yet in the dictionary, add it with a count of 1
else:
word_counts[word] = 1
# Print the resulting word count dictionary
print(word_counts)
Explanation:
This code uses the open() function to open the "text.txt" file for reading, and then reads each line of the file using a for loop. Each line is split into individual words using the split() method, and then each word is cleaned up by removing any punctuation and converting it to lowercase. The code then adds each word to a dictionary and counts the number of occurrences of each word. Finally, the resulting dictionary of word counts is printed to the console.
Which of the following best explains the ability to solve problems algorithmically? Group of answer choices Any problem can be solved algorithmically, though some algorithmic solutions require a very large amount of data storage to execute. There exist some problems that cannot be solved algorithmically using any computer. Any problem can be solved algorithmically, though some algorithmic solutions must be executed on multiple devices in parallel. Any problem can be solved algorithmically, though some algorithmic solutions may require humans to validate the results.
Answer:
I think it’s There exist some problems that cannot be solved algorithmically using any computer.
Explanation:
There exist some problems that cannot be solved algorithmically using any computer represent the best explanation of the ability to solve problems algorithmically.
The following information should not be considered:
It does not required large amount of data store to excute. The algorithmic solutions that must be executed should not be in multiple devices in parallel. It does not required humans for validating the results.Learn more: brainly.com/question/17429689
Who watches Riverdale ? if you do can we be friends(pLEASE DON'T DELETE) and also who is your fav character from Riverdale
Answer:
I have watched it before
Answer:
my fav is veronica lol
Explanation:
Test if a password entered is correct. The secret phrase is “Amedeo Avogadro” (without the quotes).
Sample Run 1
Enter the password: Amedeo Avogadro
Sample Output 1
Correct!
Sample Run 2
Enter the password: Georg Cantor
Sample Output 2
Not Correct
i need the code to find the right answer please
Answer:
Here's a Python code snippet that will prompt the user to enter a password and then check if it matches the secret phrase "Amedeo Avogadro":
# Prompt user to enter password
password = input("Enter the password: ")
# Check if password is correct
if password == "Amedeo Avogadro":
print("Correct!")
else:
print("Not Correct")
Explanation:
You can run this code in a Python environment or save it as a .py file and run it in the command line.
if you position the mouse pointer over the border of a column and double-click it, ____.
If you place the mouse pointer above a column's border and double-click it, the column will adapt to fit the widest entry in the column.
What happens if you press the Tab key while the insertion point is in the final cell of a table?
Use your keyboard's arrow keys or the Tab key to switch between cells. Pressing the Tab key will instantly start a new row if the insertion point is in the final cell.
What takes place when the table move handle is clicked?
The table may be moved by clicking and dragging the table move handle. On the Insert tab, there is a table button. To change the width of columns, use the AutoFit command.
To know more about mouse pointer visit:
brainly.com/question/28031890
#SPJ4
A customer is building a high-end gaming PC and is seeking an appropriate power supply unit. Which of the following featuresets of a power supply should be installed? (Select THREE).A. Mini-ITX form factorB. High number of connectorsC. 24-pin main connectorD. 20-pin main connectorE. 350-450 watts of powerF. Dual 12v rails
The three featuresets of a power supply should be installed by the customer who is high-end gaming PC are High number of connectors, 24-pin main connector, and the Dual 12v rails.
What is the gaming PC?Gaming PCs are distinguished from standard desktop computers by the use of high-performance video cards, high-core-count central processor units with raw horsepower, and higher-performance RAM.
Other demanding jobs, such as video editing, are also performed on gaming PCs. A dedicated graphics card will be found in the majority of gaming PCs.
This comes with increased resources and processing power that will be dedicated solely to visual quality on the machine. This has a clear influence on video game quality, giving better frame rates with significantly less graphical latency.
Therefore, High number of connections, 24-pin main connector, and Dual 12v rails are the three feature sets of a power supply that should be placed by the client who is building a high-end gaming PC. So, options B, C and F are correct.
Learn more about the gaming PC, refer to:
https://brainly.com/question/6500979
#SPJ2
1.) what major accomplishment is achieved by the deep mind software described by koch?
Without additional information on the specific article or reference to which you are referring, it is difficult to provide a precise answer. However, DeepMind is a company that has developed advanced artificial intelligence (AI) systems for various applications, including gaming, robotics, and healthcare.
One of the major accomplishments of DeepMind is its development of AlphaGo, an AI system that defeated the world champion at the ancient Chinese game of Go. AlphaGo's success was significant because Go is a complex game that requires strategic thinking and intuition, making it much harder for a computer to play than games like chess. AlphaGo's victory was seen as a major milestone in the development of AI and demonstrated the potential of machine learning techniques, particularly deep neural networks, to solve complex problems.
DeepMind has also made significant contributions to the development of AI in other areas, such as natural language processing, protein folding prediction, and drug discovery. Its research has helped to advance the field of AI and has the potential to lead to significant breakthroughs in a variety of fields.
Learn more about machine learning here:
https://brainly.com/question/16042499
#SPJ11
What type of restaurant are you headed to?
Italian
Caribbean
Chinese
I'm headed to an Italian restaurant because I love Italian cuisine and I'm in the mood for some delicious pasta dishes.
The type of restaurant that you are headed to is the Italian restaurant. Thus, the correct option for this question is A.
What are Italian restaurants famous for?Italian cuisine is popular because it's delicious, authentic, and healthy. Its traditional recipes have been passed down through generations to become staples in this type of Cuisine.
In Italian restaurants, meals are made using fresh produce, from herbs and vegetables to meats. There are no artificial ingredients or processed food; an Italian meal is made from scratch. It includes Pizza, Pasta, Risotto, Spaghetti carbonara, Polenta and cured meats, seafood, etc.
Therefore, the type of restaurant that you are headed to is an Italian restaurant. Thus, the correct option for this question is A.
To learn more about Italian restaurants, refer to the link:
https://brainly.com/question/10166291
#SPJ2
How did tribes profit most from cattle drives that passed through their land?
A.
by successfully collecting taxes from every drover who used their lands
B.
by buying cattle from ranchers to keep for themselves
C.
by selling cattle that would be taken to Texas ranches
D.
by leasing grazing land to ranchers and drovers from Texas
The way that the tribes profit most from cattle drives that passed through their land is option D. By leasing grazing land to ranchers and drovers from Texas.
How did Native Americans gain from the long cattle drives?When Oklahoma became a state in 1907, the reservation system there was essentially abolished. In Indian Territory, cattle were and are the dominant economic driver.
Tolls on moving livestock, exporting their own animals, and leasing their territory for grazing were all sources of income for the tribes.
There were several cattle drives between 1867 and 1893. Cattle drives were conducted to supply the demand for beef in the east and to provide the cattlemen with a means of livelihood after the Civil War when the great cities in the northeast lacked livestock.
Lastly, Abolishing Cattle Drives: Soon after the Civil War, it began, and after the railroads reached Texas, it came to an end.
Learn more about cattle drives from
https://brainly.com/question/16118067
#SPJ1
Identify the types of information that are necessary to communicate with emergency responders.
The following information are necessary to communicate with emergency responders:
The chemicals that are involved in an incident.Any other hazards present in the laboratory.How the incident occurred or happened.Who is an emergency responder?An emergency responder can be defined as an individual who has the requisite training, license and expertise to respond to an unexpected and dangerous situation.
The examples of emergency.Some examples of an unexpected and dangerous situation are:
FireEarthquakeFloodIn conclusion, the following information are necessary to communicate with emergency responders:
The chemicals that are involved in an incident.Any other hazards present in the laboratory.How the incident occurred or happened.Read more on emergency responders here: https://brainly.com/question/20721365
write a progam to add to simple number and stores into an array and finds their sum and average
Here's a Java program that prompts the user to input two numbers, stores them in an array, calculates their sum and average, and outputs the results:
import java.util.Scanner;
public class AddNumbers {
public static void main(String[] args) {
Scanner input = new Scanner(System.in);
// Prompt the user to input two numbers
System.out.print("Enter the first number: ");
double num1 = input.nextDouble();
System.out.print("Enter the second number: ");
double num2 = input.nextDouble();
// Store the numbers in an array
double[] nums = {num1, num2};
// Calculate the sum and average
double sum = nums[0] + nums[1];
double avg = sum / 2;
// Output the results
System.out.println("The sum of " + nums[0] + " and " + nums[1] + " is " + sum);
System.out.println("The average of " + nums[0] + " and " + nums[1] + " is " + avg);
}
}
This program uses a Scanner object to read in two numbers from the user. It then stores the numbers in an array, calculates their sum and average, and outputs the results to the console using System.out.println().
Note that this program assumes that the user will input valid numbers (i.e., doubles). If the user inputs something else, such as a string or an integer, the program will throw a java.util.InputMismatchException. To handle this exception, you could wrap the input.nextDouble() calls in a try-catch block.